Munshiganj, Sept 7 (UNB) - Traffic movement on Dhaka-Chittagong highway in Gazaria upazila came to a halt for about three hours following a road accident that left a covered van driver injured on Tuesday.
Police said a truck and a covered van were damaged after a collision and left lying at Meghna Bridge at about 6am that disrupted vehicular movement on the highway.
Disruption of traffic movement caused a huge traffic jam from Sonargaon in Narayanganj to Bhaberchar of Munshiganj.
Covered van driver Rahman injured in the accident took treatment at a local hospital.
Traffic movement, however, resumed at about 9am as two damaged vehicles were removed from the spot.
Local sources said the traffic jam intensified the sufferings of the people traveling on the route ahead of Eid.
Police said a truck and a covered van were damaged after a collision and left lying at Meghna Bridge at about 6am that disrupted vehicular movement on the highway.
Disruption of traffic movement caused a huge traffic jam from Sonargaon in Narayanganj to Bhaberchar of Munshiganj.
Covered van driver Rahman injured in the accident took treatment at a local hospital.
Traffic movement, however, resumed at about 9am as two damaged vehicles were removed from the spot.
Local sources said the traffic jam intensified the sufferings of the people traveling on the route ahead of Eid.
Comments
No Comments on this News



